Nupche Likhu Hydropower Project

Project Details:

Nupche Likhu Hydropower Project is located at Ramechhap district which utilizes water from Both Nupche and Likhu river. Water diverted from Nupche river and Likhu river is proposed to meet at the tunnel junction via headrace pipes and thereafter water will pass through single tunnel, buried steel penstock and then steel lined vertical shaft and steel lined tunnel to the powerhouse to generate the electric power. The project area consists of gneiss, migmatites and schist as the major composition of rock. The light to dark grey banded gneiss which was fresh to slightly weathered in most of outcrops.

The head works site of Nupche and Likhu river is located about 6-7 km upstream from the confluence of Nupche and Likhu river. At the head works site of both river, the river gradient is very high and riverbed composed of huge boulders. Thick old moraine deposits are presented between valley wall and river banks as like terraces. The lower part has boulder dement material whereas the upper part is gravelly dominated. The upper part of the deposit is loose and unconsolidated in compare to lower part.

Project Layout

Nuphe Likhu Project Layout

Current Major Equipment at Project Site

SN

Name of Equipment

Model

Capacity

No.

Remarks

1

Excavator

Volvo EC 210 D,

Hyundai 220 LS

23 Ton, 22 Ton, 22 Ton,

 

22 Ton, 22Ton

5

 

2

Tipper

1613c

7.5 cum

8

 

3

Shotcrete machine

PZ 3000

12 cum/hr.

4

 

4

Grout Pump

M400 NT

5 bars/hr.

2

 

5

Rock drill hammer

YT 29

 

25

 

6

Pusher leg

FT16 A

 

7

 

7

Air Compressor

CPS 400D

 

4

 

8

Generator

 

30KVA,125KVA,250KVA

1+3+1

30 KVA Camp, Crusher (125), Power House (125,250),

Vertical Shaft (125)

9

Portable Concrete

Mixture

RM800

2 Bags per mix

3

 

10

Laboratory Concrete

Mixture

 

Half Bag

2

 

11

Loader

SD200, 936

2 Cum

2

 

12

Back Hoe Loader

 

 

1

 

13

Rock Crusher

Impact

50TPH

1

 

14

ROC

9090 0492 00

 

1

 

15

Welding Machine

 

 

6

 

16

Steel Bar Bending Machine

GW40

 

2

 

17

Steel Bar Cutting

Machine

GW40

 

2

 

18

Total station

Sokkia IM50

 

2

 

19

Level Machine

Auto level

B40AWS167942, Sokkia

 

1+4

 

20

Breaker

TCI P 200 BKA

 

1

 

21

Lathe Machine

10'

 

1

 

22

Muck Loader

 

 

2

 

23

Tractor

 

 

2

 

23

Boomer

 

 

1

 

24

Winch

Machine/Crane

 

 

1

 

25

VSI

 

 

1

 

 

Project Progress Bar

Under Progress 78%