Sunam Infrastructure Nirman Pvt. Ltd.

Upper Kalanga Gad Hydroelectric Project (38.4 MW)

Upper Kalanga Gad Hydropower Project (38.46 MW)

Client: Sanigad Hydro Private Limited.

Type of Work: All Construction related Work

The project site is located  in Kalanga Gad (River), Bajhang District of Far Western Province of Nepal. It is a run of River Project with gross head of 585.50 m. 

Salient Features

Units of work completed

% Complete

Remarks

Headworks

100%

 

Concrete

9,576 cum

 

 

Rebar

706 ton

 

 

Formwork

20,965 Sq. m.

 

 

Headrace Tunnel

 

 

 

Size

2.96 m x 2.96 m

 

 

Length

7,811 m

 

 

Underground Excavation

77,592 cum

100%

 

Rock Bolt

24,163 Nos.

 

 

Shotcrete

1,06,807 Sq. m

 

 

Concrete

2,128 cum

 

 

Surge Shaft

100%

 

Size

5m dia x 154.52m height

 

 

Excavation

2,165 cum

 

 

Penstock

 85%

 

Length

1,200m

 

 

Powerhouse/Tailrace

95%

 

Powerhouse Size

51.30m (L) x 21.10m (B) x 17.5m (H)

 

 

Concrete

4,784 cum

 

 

Rebar

740 ton

 

 

Formwork

10,669 sq. m

 

 

 

Total Concrete

 29,472 cum

 

 

Total Rebar Used

 2,589 ton

 

 

Total Formwork

 58,100 sq.m

 

 

Project Progress Bar

Completed Successfully 100%