Upper Kalanga Gad Hydropower Project (38.46 MW)
Client: Sanigad Hydro Private Limited.
Type of Work: All Construction related Work
The project site is located in Kalanga Gad (River), Bajhang District of Far Western Province of Nepal. It is a run of River Project with gross head of 585.50 m.

Salient Features |
Units of work completed |
% Complete |
Remarks |
Headworks |
100% |
|
|
Concrete |
9,576 cum |
|
|
Rebar |
706 ton |
|
|
Formwork |
20,965 Sq. m. |
|
|
Headrace Tunnel |
|
|
|
Size |
2.96 m x 2.96 m |
|
|
Length |
7,811 m |
|
|
Underground Excavation |
77,592 cum |
100% |
|
Rock Bolt |
24,163 Nos. |
|
|
Shotcrete |
1,06,807 Sq. m |
|
|
Concrete |
2,128 cum |
|
|
Surge Shaft |
100% |
|
|
Size |
5m dia x 154.52m height |
|
|
Excavation |
2,165 cum |
|
|
Penstock |
85% |
|
|
Length |
1,200m |
|
|
Powerhouse/Tailrace |
95% |
|
|
Powerhouse Size |
51.30m (L) x 21.10m (B) x 17.5m (H) |
|
|
Concrete |
4,784 cum |
|
|
Rebar |
740 ton |
|
|
Formwork |
10,669 sq. m |
|
|
|
|||
Total Concrete |
29,472 cum |
|
|
Total Rebar Used |
2,589 ton |
|
|
Total Formwork |
58,100 sq.m |
|
|